One team, start to finish
The same team carries the job from design through build, installation and handover. Nothing is lost in a handoff between a design office and a site crew, because there is not one.
We are an EICA design, build, commissioning and handover specialist based in South Wales, delivering capital and upgrade projects on live sites across the UK.
Most problems on an EICA project show up at commissioning, but they start much earlier: a design that never met the site, a panel built to a drawing nobody checked, a switchover planned on the day. We keep design, build, installation and commissioning under one roof so those gaps do not open up.
That means electrical designs that consider isolation and phasing before the first cable is pulled, MCCs laid out so a maintenance technician can work in them at two in the morning, and a handover pack that is still useful in five years.

The same team carries the job from design through build, installation and handover. Nothing is lost in a handoff between a design office and a site crew, because there is not one.
Isolation, temporary supplies, phasing and switchover are planned at design stage, not negotiated on the day with an operations manager.
Treatment works, generation plant, production lines and clinical sites all share one thing: they cannot simply stop. We design and install for regulated outputs, critical power and long asset life.
Test results, calibration records, as-builts and software backups are part of the scope, not an afterthought once the invoice is out.

We will tell you honestly whether it is a job for us, how we would sequence it and what it would take to get it commissioned.
Request capability statement