01 / Process

How we deliver.

A five stage process that keeps design, build, installation and commissioning under the same engineering thread, phased around an operation that has to keep running.

  1. 01

    Define

    Site survey, asset condition review, load and risk assessment, scope definition.

    Scope and options report

  2. 02

    Design

    Electrical design, control philosophy, schematics, panel and instrument schedules.

    FDS, GAs and schematics

  3. 03

    Build and test

    Panel manufacture, software development, pre-assembly and witnessed factory testing.

    ITP and FAT records

  4. 04

    Install and commission

    Installation, inspection and test, loop checking, energisation and functional commissioning.

    Test sheets and SAT

  5. 05

    Handover

    As-builts, software backups, O&M records, familiarisation and defect close-out.

    O&M pack and training

02 / Engagement

Scope it how it suits your framework.

01

Design only

Electrical design, control philosophy, functional design specification, schematics, panel GAs and instrument schedules, issued for your own contractor to build and install.

02

Design and build

MCCs, control panels and pre-assembled equipment designed and built to your specification, factory tested with you present and delivered ready to install.

03

Full turnkey delivery

One point of responsibility from survey through design, build, installation, commissioning and handover, phased around process availability and your outage windows.

Operator at a SCADA workstation showing a water treatment process mimic diagram
Start a conversation

Tell us the site, the asset and the constraint.

We will come back with a straight answer on scope, sequence and programme, and a capability statement if you need one for your framework.

Start a conversation